VANCOUVER, British Columbia, Nov. 16, 2026 (GLOBE NEWSWIRE) -- Yukon Metals Corp. (CSE: YMC, FSE: E770, OTCQB: YMMCF) (“Yukon Metals” or the “Company”) is pleased to report assay results from two diamond drill holes, including 1.0 metre grading 33.40 g/t gold in BR26-008, approximately 125 metres west of the high-grade gold previously reported from BR26-007, and 30.8 metres grading 0.17% copper in BR26-010 in the central part of the skarn system. Both drill holes were completed during the 2026 exploration program at the Company’s 100%-owned Birch Copper-Gold Project (“Birch”), located approximately 65 kilometres northeast of Burwash Landing, Yukon.

Highlights

Yukon Metals Intersects 33.40 g/t Gold Over 1.0 Metre and 30.8 Metres of 0.17% Copper and 0.14 g/t Gold Mineralization at Birch Project, Yukon
Yukon Metals Intersects 33.40 g/t Gold Over 1.0 Metre and 30.8 Metres of 0.17% Copper and 0.14 g/t Gold Mineralization at Birch Project, Yukon
Yukon Metals Intersects 33.40 g/t Gold Over 1.0 Metre and 30.8 Metres of 0.17% Copper and 0.14 g/t Gold Mineralization at Birch Project, Yukon
Yukon Metals Intersects 33.40 g/t Gold Over 1.0 Metre and 30.8 Metres of 0.17% Copper and 0.14 g/t Gold Mineralization at Birch Project, Yukon
Yukon Metals Intersects 33.40 g/t Gold Over 1.0 Metre and 30.8 Metres of 0.17% Copper and 0.14 g/t Gold Mineralization at Birch Project, Yukon

Globenewswire