Osisko Gold Extends High-Grade Mineralization at Lowhee ~500 m Along Strike and 250 m Below the Current Resource, Highlighting Near-Mine Growth Potential at Cariboo Gold Project; Intercepts include 104.14 g/t Au over 1.50 m (600 m Vertical Depth), and 16.08 g/t Au over 4.55 m (325 m Vertical Depth)
Osisko Gold Extends High-Grade Mineralization at Lowhee ~500 m Along Strike and 250 m Below the Current Resource, Highlighting Near-Mine Growth Potential at Cariboo Gold Project; Intercepts include 104.14 g/t Au over 1.50 m (600 m Vertical Depth), and 16.08 g/t Au over 4.55 m (325 m Vertical Depth)
11,059 m of new underground and surface exploration drilling targeting the southeast lateral extension of the Lowhee Zone and the down-dip continuation into Lowhee Deep.
Drilling intersected high-grade gold outside the current mineral resource footprint, highlighting potential for near-mine resource growth along ~500 m of lateral strike extent and to vertical depths of ~600 m, more than 250 m below the current mineral resource.
Notable intercepts outside the current mineral resource footprint include: 104.14 g/t Au over 1.50 m at ~600 m vertical depth in BM-26-002 (incl. 312.00 g/t Au over 0.50 m), and 16.08 g/t Au over 4.55 m at ~325 m vertical depth in BMU-26-057 (incl. 4.88 g/t Au over 0.50 m, 60.70 g/t Au over 0.75 m, and 45.30 g/t Au over 0.50 m).
TORONTO, Nov. 24, 2026 (GLOBE NEWSWIRE) -- Osisko Gold Group Inc. (NYSE: OGG, TSXV: OGG) ("Osisko Gold" or the "Company") is pleased to announce new results from 11,059 metres ("m") of exploration diamond drilling in 37 holes targeting the down-dip extension of the Lowhee Zone ("Lowhee Deep") and its southeast lateral strike extension on Barkerville Mountain ("Lowhee SE"). Drilling was conducted from the 1260 m underground level in the Lowhee Zone and from surface on Barkerville Mountain at the Company's flagship, 100%-owned Cariboo Gold Project (the "Project"), currently under construction in central British Columbia, Canada.
Chris Lodder, President, commented: "Leveraging available underground drill bays and deeper drilling from surface, recent exploration results continue to highlight the near-mine resource growth potential of the Lowhee Zone, both laterally along strike and at depth. Drilling intersected high-grade gold mineralization over significant widths immediately along strike of the Cariboo deposit, in areas where few vein corridors have been modelled. At depth, hole BM-26-002 intersected significant gold mineralization more than 250 metres below modelled mineral resources. These results underscore the importance of continued exploration in underexplored areas, expanding our understanding of the geological model and identifying opportunities for future resource growth."
Corporate Update
The Company also announces that David Rouleau, Vice President, Project Development, intends to retire from his role effective January 1, 2027. Mr. Rouleau will continue to serve the Company in an advisory capacity throughout 2027. "On behalf of the Board and management, I would like to thank Dave for his many contributions to the progress of the Cariboo Gold Project. We are grateful for his commitment over the years and will continue to benefit from his guidance as he transitions into retirement," said Sean Roosen, Chairman and CEO.
The Company also appointed Facundo Meyniel as Vice President, Finance, effective November 24, 2026, who joins from PricewaterhouseCoopers LLP (PwC Canada), where he spent more than 15 years auditing publicly listed mining companies.
DRILL ASSAY HIGHLIGHTS
This news release contains assays from 37 diamond drillholes ("DD") completed from both surface and underground ("UG") totaling 11,059 m. Underground drilling toward the southeast from the L1260-ORE-002-DBY-002 and L1260-RMK-01 drill stations totalled 6,620 m in 29 drillholes with depths ranging from 57.2 to 546.35 m. A total of 4,439 m in 8 drillholes ranging from 361 to 897 m in length were completed from surface toward the northwest from various collars in the Lowhee SE extension zone on Barkerville Mountain (see Tables 3 and 4, and Figures 3-5). All drillholes were collared in HQ (63.5 millimetre diameter) and reduced to NQ (47.6 millimetre diameter) where necessary to continue advancing or implement directional drilling (surface DD only). Available tooling for directional drilling requires advancing in NQ with a BQ (36.5 millimetre diameter) output while steering is active. Select fire assay highlights from intercepts outside the current mineral resource footprint include: