VANCOUVER, British Columbia, Oct. 26, 2026 (GLOBE NEWSWIRE) -- Li-FT Power Ltd. (“LIFT” or the “Company”) (TSXV: LIFT) (ASX: LFT) (OTCQX: LIFFF) (Frankfurt: WS0) is pleased to announce assay results from the first 5 of 45 drill holes from the Adina-Galinée Lithium Project (“AGLP”) in Québec, Canada (Figure 1). The 45 holes comprise 39 holes totaling 11,420.5 metres completed as part of LIFT’s 2026 summer drilling program, together with 6 previously unreleased historical drill holes from 2024 (1,983 metres), totalling 13,403.5 metres of drill core. Holes ALP-0001 to ALP-0005C from the 2026 drill campaign are presented in this release. The intercepts for drill holes ALP-0001 to ALP-0005C are presented in Table 1 and shown in figures 2, 3 & 4, with a highlight of 56 meters of 1.43 % Li2O intersected in drillhole ALP002.

Table 1 – Drill intercept from Holes ALP0001 to ALP0005C

Li-FT Announces First Results from Summer Drill Program at the Adina-Galinée Lithium Project, Quebec
Li-FT Announces First Results from Summer Drill Program at the Adina-Galinée Lithium Project, Quebec
Li-FT Announces First Results from Summer Drill Program at the Adina-Galinée Lithium Project, Quebec
Li-FT Announces First Results from Summer Drill Program at the Adina-Galinée Lithium Project, Quebec

Globenewswire