Also reports 918.8 m of 0.62% CuEq, including 302 m of 0.76% CuEqand901 m of 0.47% CuEq, including 196 m of 0.73% CuEqand940.7 m of 0.49% CuEq, including 165 m of 0.80% CuEqand841.9 m of 0.54% CuEq, including 253 m of 0.73% CuEq

VANCOUVER, British Columbia, Oct. 05, 2026 (GLOBE NEWSWIRE) -- Aldebaran Resources Inc. (“Aldebaran” or the “Company”) (TSX-V: ALDE, OTCQX: ADBRF) is pleased to provide results from all remaining holes of the 2025-2026 infill and geotechnical drilling program at the Altar project in San Juan, Argentina. The drilling program was designed to upgrade Inferred resources to the higher-confidence Measured and Indicated categories while also supporting geotechnical studies. Several of the holes reported today were drilled exclusively for geotechnical purposes in final pit wall areas where significant mineralization was not expected.

Globenewswire